Get the latest listings directly to your inbox!
Complete interior remodel, new roof and new A/Cs. The interior was gutted down to the framing. 2 Euro Loft beds where installed that drop out of the ceiling for extra sleeping. New solid wood cabinets, new flooring, all new upholstery, ceramic tile shower with glass door, farmhouse sink in kitchen, new sinks in bathroom and master, new TVs in living room and master, living room TV is on a televator, plus so much more.
New tires in April of 2022.
Annual service on chassis and generator just completed on 5/25/23.
Upgraded and tuned ECM for better climbing and pulling power.
Stored inside when not being used.